• $5.3 million
    Invested

Witton Bluff Base Trail involves the creation of a 1.37 km section of accessible pathway around Witton Bluff, between the foreshore at Christies Beach and Port Noarlunga.

This project involves:

  • Upgrade of the existing unsealed pathway from Christies Beach to the wave-cut shelf to a 3-metre-wide (4m including 0.5m shoulders) shared-use path.
  • A new boardwalk above the wave-cut shelf designed to accommodate both pedestrians and cyclists.
  • New and formalised viewing areas and pedestrian and cyclist access connections to adjoining shared path and cycle networks.
  • New landscaping and revegetation with local indigenous species suitable to the coastal environment, along with interpretive signage, trail lighting and furniture and public art.

This project is delivered through local council.

Total investment: $5.3 million ($2.65 million in state government grants).

Project start:
December 2020
Expected completion:
December 2021
Current status:
Pre-construction